The is now open in Brisbane, Queensland. The bridge, referring to the synergy between the bridge's tension and compression components, will provide access for over the river each month. In addition, the bridge's 84 solar panels will provide 75-100% of the energy needed to power the bridge's LED lights, saving the city 37.8 tons of carbon emissions a year. It is currently the largest tensegrity structure in existence.
–Alison Kelman